Great Island Power Station, – Wexford
Contractor: John Sisk & Sons / Banagher Precast
ICMS Precast was awarded the installation of the bridge deck, which span the cooling outflow channel. The channel spans 16m wide and over 90m in length. The bridge deck comprised of TY9 beams and slabs spanning between the beams, which allowed an insitu slab to be poured. One the major challenges for this project was the channel had to remain functioning, while the construction of the deck was ongoing to allow the existing power plant to remain operational.
This new facility also required the installation of transformer blast walls which ICMS Precast successful delivered on time and within budget.